Floor space – 4 200 m2 Cubic capacity - 18 350 m3
The scope of work included preparing engineering documentation encompassing:
- foundations, architecture, basis for developing the main steel structure manufactured by B.P. Mostostal Siedlce, steel structures supporting walls and roofs, water and sanitary systems, central heating, HVAC, preparing bidding action for ventilation and air conditioning equipment, electrical and telecommunications networks, audio system, CCTV, fire alarm and sprinkler systems
- author's supervision


